March 20. 2013 – Net Zero Build and Design
Update On Site and plans:
All building plans are near completion.
The Engineer has extensive experience with timber frame building.
The locally harvested timbers are cracked up and ready for the sawmill. When the weather breaks the stripping and cutting will begin.
The septic permit is in place and test hole is done.
NetZeroBuild.ca has hired a master timber framer for the month of June. I had him do some work on my current home and it worked out great.
All the timbers have been sealed at the ends to minimize checking. We scoped all the timbers for the build and we have lots of fabulous timber on hand.