We have worked out all the design details with the Erik Michele and the Engineer.
I feel very fortunate to have found Rob , Michele and Erik ( Engineer,draftsperson and timber framer ).
It’s so great to have them on my net zero team.
Each one brings great expertise to the party.
We will be ready to get our building permit next week.
The larger, more automated saw mill will arrive next week and we can start sawing the timbers.
This will be very specialized as the timbers will be like nothing I have ever seen before. I still need to find and harvest a few more maple columns.
I cleared the area where the mill will be setup today and went hunting for some column pieces. It’s going to be great to start shaping the columns and the big timbers.
Can’t wait.
During my quest to find the perfect tool to help with the debarking process I met a friend of Erik’s.
Andy is an expert in wood cleaning and finishing. It was great to go over his thoughts and experience on the process.
The Engineer has extensive experience with timber frame building.
The locally harvested timbers are cracked up and ready for the sawmill. When the weather breaks the stripping and cutting will begin.
The septic permit is in place and test hole is done.
NetZeroBuild.ca has hired a master timber framer for the month of June. I had him do some work on my current home and it worked out great.
All the timbers have been sealed at the ends to minimize checking. We scoped all the timbers for the build and we have lots of fabulous timber on hand.
Recent Comments